Achievement Note: GPON End-to-End Solution for Envoy Hotel

Project Overview: We are proud to announce the successful implementation of a comprehensive GPON (Gigabit Passive Optical Network) end-to-end solution for the Envoy Hotel, executed through PT&T. This project was designed to enhance the hotel’s connectivity infrastructure, providing guests with high-speed internet access and supporting the hotel’s operational needs.

Key Achievements:

  1. Project Completion:

    • Successfully completed the GPON installation, including the deployment of OLT (Optical Line Terminal) equipment and ensuring minimal disruption to hotel operations.
  2. High-Speed Connectivity:

    • Delivered a robust network capable of supporting up to 10 Gbps of bandwidth, significantly improving guest internet experience and enabling seamless streaming, conferencing, and other online activities.
  3. Scalability:

    • Designed the GPON solution with scalability in mind, allowing for future upgrades and expansions to accommodate the hotel’s growing needs.
  4. Cost Efficiency:

    • Achieved a reduction in operational costs compared to previous network solutions, thanks to the efficiency of the GPON technology and the integration of OLT equipment.
  5. Enhanced Guest Experience:

    • Received positive feedback from guests regarding the improved internet speed and reliability, contributing to an increase in overall guest satisfaction ratings.
  6. Training and Support:

    • Provided comprehensive training for the hotel staff on managing and troubleshooting the new system, including the OLT equipment, ensuring they are equipped to handle any issues that may arise.
  7. Sustainability:

    • Implemented energy-efficient technologies within the GPON infrastructure, aligning with the hotel’s commitment to sustainability and reducing its carbon footprint.

Impact: The successful deployment of the GPON end-to-end solution, including OLT equipment, has positioned the Envoy Hotel as a leader in providing high-quality connectivity services in the hospitality sector. This project not only enhances the guest experience but also supports the hotel’s operational efficiency and future growth.

Acknowledgments: We would like to extend our gratitude to the project team, partners, and stakeholders who contributed to the successful execution of this project. Your dedication and expertise were instrumental in achieving this milestone.

Next Steps: We look forward to monitoring the performance of the GPON solution and exploring further enhancements to ensure the Envoy Hotel continues to provide exceptional service to its guests.

List of completed GPON projects.

  1. CONVERGE FTTH – GPON Build-up in –MUNTINLUPA (Parkhomes Tunasan) January 27, 2017.
  2. CONVERGE FTTH – GPON Build-up in – St. Francis Condominium (with Slab Scanning )February 15, 2017.
  3. CONVERGE FTTH – GPON Build-up in One Jeroma Place ( Congressional Ave. Ext. Quezon City – February 23,2017.
  4. PLDT FTTE – GPON Build-up in Figaro Solutions Inc, February 24, 2017.
  5. Smart FBTS Link in -Makati, Dian Cell Site- Palanan Cell Site, March 15, 2017.
  6. CONVERGE FTTH – GPON Build-up in – THREE JEROMA PLACE (Congressional Ave, Ext.Quezon City – February 23,2017.
  7. CONVERGE FTTH – GPON Build-up in – ISLAND PALM TOWER CONDOMINIUM (34 N.Domingo Ave. New Manila, Quezon, City) – March 20, 2017.
  8. PLDT E2E FTTE Link in – QUEZON CITY (Greenpeace Sea Environmental Trust Inc.) – April 18,2017.
  9. PLDT E2E FTTE Link in – QUEZON CITY (Continental Court Bldg. (Dr. Ventura) – April 18, 2017
  10. PLDT E2E FTTE Link in – MANILA (UP Manila-National Institute of Health) – April 18, 2017
  11. CONVERGE FTTH – GPON Build-up in – CRISANTA TOWER (325 Captain Javier St. Brgy.Oranbo, Pasig City) – April 19, 2017.
  12. CONVERGE FTTH – GPON Build-up in – GOTACO BLDG 1&2 (74 Valencia St. Quezon City) – April 19, 2017.
  13. PLDT E2E FTTE Link in – RIZAL (Municipality of Angono) – April 25, 2017.
  14. PLDT E2E FTTE Link in – MANILA (UP Manila – National Institute of Health) – May 16, 2017.
  15. PLDT E2E FTTE Link in – QUEZON CITY (D&L Industries) – May 15, 2017.
  16. PLDT E2E FTTE Link in – MANILA (Espana Grand Residences Tower 2) – May 15, 2017.
  17. PLDT E2E FTTE Link in – VALENZUELA (Bestank Manufacturing Corp) – May 15, 2017.
  18. PLDT E2E FTTE Link in – ANTIPOLO (Tanay Rural Bank Inc.) – May 15, 2017.
  19. PLDT E2E FTTE Link in – PASIG (ComClark Network and Technology Corp) – May 15, 2017.
  20. PLDT E2E FTTE Link in – QUEZON CITY (Bureau of Fisheries and Aquatic Resources) – May 15,2017.
  21. PLDT E2E FTTE Link in – QUEZON CITY (Department of Interior and Local Government) – May20,2017.
  22. PLDT E2E FTTE Link in – CAINTA (Tanay Rural Bank Inc.) – May 15, 2017.
  23. PLDT E2E FTTE Link in – ANTIPOLO RIZAL (Cherry Foodarama) – May 20, 2017.
  24. PLDT E2E FTTE Link in – PASIG (HTech Corporation (Rosario)) – May 23, 2017.
  25. PLDT E2E FTTE Link in – PASIG (HTech Corporation (Mercedes)) – May 23,2017.
  26. PLDT E2E FTTE Link in – MANILA (Maxicare) – May 25, 2017.
  27. PLDT E2E FTTE Link in – QUEZON CITY (Motor and Carriage Inc.) – May 25, 2017.
  28. PLDT E2E – FTTE Link in – PASIG (Bramante Commercial Center) – May 26, 2017.
  29. PLDT E2E FTTE Link in – PASIG (45 San Miguel) – May 26, 2017.
  30. PLDT E2E FTTE Link in – PASIG (Greenhills Christian Fellowship) – May 26, 2017.
  31. CONVERGE FTTH – GPON Build-up in – ALPHA GRAND VIEW CONDOMINIUM (
    1716 MHDel Pilar St. Malate, Manila) – June 02, 2017.
  32. SKYRISE FTTH GPON Build-up in – MAPRE INSULAR CORPORATE CENTER (MBP,Alabang, Muntinlupa) – June 13, 2017.
  33. CONVERGE FTTH – GPON Build-up in – INSULAR HEALTH CARE BUILDING (167 LegaspiSt. Cor. Dela Rosa St. Legaspi Village, Makati City) – July 03, 2017.
  34. CONVERGE FTTH – GPON Build-up in – INSULAR LIFE BUILDING (Paseo de Roxas cor.Ayala Ave. Makati, City) – July 03, 2017.
  35. PLDT E2E FTTU – GPON Build-up in PASIG (Taipan Place). July 03, 2017.
  36. PLDT E2E FITL Link – GMM (Antipolo City Valley View Drive 2) – July 14, 2017.
  37. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Marikina City Health Center)– July22,2017
  38. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Olandes Health Center) Additional – July22, 2017.
  39. PLDT E2E FTTE Link in – MAKATI (Raffles Makati) – July 25, 2017.
  40. PLDT E2E FTTE Link in – MAKATI (DBP Building) – July 25, 2017.
  41. PLDT E2E FTTE Link in – QUEZON CITY (Studio A) – July 25, 2017.
  42. CONVERGE FTTH – GPON Build-up in – ASPEN TOWER (Muntinlupa) – August 23, 2017
  43. PLDT E2E FTTE Link in – QUEZON CITY (Gateway Tower/Cybergate Tower 1) – September 05,2017
  44. CONVERGE FTTH – GPON Build-up in – VALENCIA HILLS CONDOMINIUM (San Juan City) –
  45. CONVERGE FTTH – GPON Build-up in – STUDIO CITY TOWER 1 (West Park Drive FilinvestCorporate City Alabang Muntinlupa) – September 15, 2017
  46. PLDT E2E FITL Link – GMM (Cubao-Garment FITL 2) – September 14, 2017
  47. PLDT E2E FITL Link – GMM (Shaw Tower Ortigas) – September 19,2017
  48. PLDT E2E FTTE Link in – MANILA (Philippine Normal University) – September 18, 2017
  49. PLDT E2E FTTU – GPON Build-up – MAKATI (Paseo De Roces Tower 1) – October 02, 2017
  50. CONVERGE FTTH – GPON Build-up in – STUDIO CITY TOWER 2 (Muntinlupa City) –
    October5, 2017
  51. CONVERGE FTTH – GPON Build-up in – INSULAR HEALTH CARE BUILDING (167 LegaspiSt. Cor. Dela Rosa St. Legaspi Village, Makati City) Additional – October 9, 2017
  52. PLDT E2E FTTE Link in – MARIKINA (FDC-Interim for Topbest Pest Inc.) – October 16, 2017
  53. PLDT E2E FTTE Link in – RIZAL (APT Entertainment Building, Cainta) – October 19, 2017
  54. PLDT E2E FITL Link – GMM (South Marikina FITL 4) – October 24,20CONVERGE FTTH – GPON Build-up in – VALENCIA HILLS CONDOMINIUM (SanJuan City) Additional – October 18, 2017
  55. PLDT E2E FTTU – GPON Build-up – PARANAQUE (Monarch Parksuites Cluster 1-4) – November2, 2017
  56. PLDT E2E FTTU – GPON Build-up – QUEZON CITY (The Sky Suites Tower (GA Sky Suites)) – November 6,2017
  57. PLDT E2E FTTU – GPON Build-up – MANDALUYONG (California Garden Square Cluster A-F) – November 6, 2017
  58. PLDT E2E – PASIG (FDC – Interim for Goldilocks Bakeshop, Inc.) – November 8, 2017
  59. PLDT E2E – QUEZON CITY (Ortigas and Company Limited Partnership) – November 9, 2017
  60. CONVERGE FTTH – GPON Build-up in – SOLER TOWER (1336 Soler St. Sta. Cruz, Manila) – November 2, 2017
  61. PLDT E2E FTTE Link in – GMM (Sogo Hotel) – November 11,2017
  62. PLDT E2E FBTS Link in – GMM (Binangonan 2) November 17,2017
  63. PLDT E2E FTTE Link in – QUEZON CITY (XTRIX Computer Corporation) – November 21, 2017
  64. CONVERGE FTTH – GPON Build-up in – ARISTA RESIDENCES (Parañaque City) – October20,2017
  65. CONVERGE FTTH – GPON Build-up in – THE CAMBRIDGE VILLAGE FORDHAM – CLUSTER 11 & 15 (Block Kabisig, Floodway, Cambridge St. Cainta, 1990 Rizal) – December 12,  2017
  66. CONVERGE FTTH – GPON Build-up in – THE IGNACIA PLACE (62 Sgt. Esguerra St. Cor.Mother Ignacia Avenue – December 6,2017
  67. CONVERGE FTTH – GPON Build-up in – DOVER HILL (San Juan City) – December 21,2017
  68. CONVERGE FTTH – GPON Build-up in – THE CAMBRIDGE VILLAGE – (CLUSTER 1- 34)Block Kabisig, Floodway, Cambridge St. Cainta, 1990 Rizal) – December 14, 2017
  69. CONVERGE FTTH – GPON Build-up in – TAGUIG CITY (The Trion Towers) – January 25, 2018
  70. PLDT E2E FTTE Link in – GMM (XITRIX Computer Corporation) Additional – January 31, 2018
  71. CONVERGE FTTH – GPON Build-up in –SAN JUAN CITY (Dover Hill) – February 5,2018
  72. CONVERGE FTTH – GPON Build-up in –WILCON IT HUB (Don Chino Roces Ave, Magallanes,Makati City) – February 28, 2018
  73. PLDT E2E FTTE Link in – GMM (Google) – March 02,2018
  74. PLDT E2E – GMM (Pasay FITL (Financial Complex Loop) – March 13,2018
  75. PLDT E2E FTTE Link in – GMM (RCBC PLAZA TOWER 2) – March 19, 2018
  76. PLDT E2E FTTE Link in – GMM (LG Electronics Philippines, Inc. (Pasig)) – March 19,2018
  77. PLDT E2E FTTE Link in – GMM –(GREPALIFE BUILDING) – March 21, 2018
  78. PLDT E2E FTTE Link in – GMM (Global Rescue Pacific LLC Philippines) – March 25, 2018
  79. CONVERGE FTTH – GPON Build-up in –LPL Center (LP Leviste Street Makati City) – March26,2018 April 11,2018
  80. CONVERGE FTTH – GPON Build-up in – The Avenue Residences (55S Tandang Sora Ave.,Novaliches, Quezon City, 1116, Metro Manila – March 26, 2018
  81. CONVERGE FTTH – GPON Build-up in – ROBINSONS PLACE RESIDENCES (Tower 1&2) –
  82. CONVERGE FTTH – GPON Build-up in -CAPRI CONDOMINIUM (W Service Road,, Ayala Alabang) – April 11,2018
  83. CONVERGE FTTH – GPON Build-up in – INSULAR HEALTH CARE BUILDING )167 Legaspi St. Cor. Dela Rosa St. Legaspi Village , Makati City) Additional – April 16, 2018
  84. CONVERGE FTTH – GPON Build-up in – GRAND CENTURY MANSION (841 Zacateros, Sta.Cruz Manila) – April 16,2018
  85. PLDT E2E FTTU – GPON Build-up – GMM (JMT Corporate Condominium) – April 19, 2018
  86. FTTH-SKYRISE – TAGUIG CITY (Arya Residences) – February 05, 2018
  87. CONVERGE FTTH – GPON Build-up in – BSA TWIN TOWER (Mandaluyong) – May 11, 2018
  88. PLDT E2E – GMM (Cubao-Garment FITL 2) – May 30,2018
  89. PLDT E2E – XAVIERVILLE SQUARE CONDOMINIUM (Quezon City) – June 27,2018
  90. CONVERGE FTTH – GPON Build-up in – LEE TOWER (Manila) – July 09,2018
  91. PLDT E2E – MAKATI CITY (Grepalife Building) – July 11, 2018
  92. FTTH-SKYRISE – QUEZON CITY (Viera Residences) – July 17,2018
  93. CONVERGE FTTH – GPON Build-up in – KNIGHT BRIDGE RESIDENCES (Makati City) – August 07,2018
  94. CONVERGE FTTH – GPON Build-up in – GRAND CENTURY MANSION (841 ZACATEROS,STA. CRUZ MANILA ) August 08,2018
  95. CONVERGE FTTH – GPON Build-up in – THE AVENUE RESIDENCES (555 Tandang Sora Ave.Novaliches, Quezon City, 1116 Metro Manila) – August 08, 2018
  96. PLDT E2E – FILINVEST 3 (Alabang) – August 10,2018
  97. PLDT E2E – ADMIRALTY BUILDING (Alabang) – August 10 ,2018
  98. CONVERGE FTTH – GPON Build-up in – BINONDO TERRACE 2 (Manila) – August 13,2018
  99. PLDT E2E – BRIGHT PLACE CONDOMINIUM (Quezon City) – August 14, 2018
  100. FTTH-SKYRISE – ALABANG (Citibank Frabelle – August 15,2018
  101. FTTH-SKYRISE – ALABANG (NOL Bldg.) – August 15,2018
  102. PLDT E2E – MAKATI CITY (Makati Executive Center) – August 22,2018
  103. CONVERGE FTTH – GPON Build-up in – STANFORD CONDOMINIUM (Manila) – August28,2018
  104. CONVERGE FTTH – GPON Build-up in – ALABANG (Studio City Tower 3) – September 03,2018
  105. FTTH – SKYRISE – MUNTINLUPA (Common Goal Tower) – September 12,2018
  106. CONVERGE FTTH – GPON Build-up in – MANILA (I TOWER) – September 17,2018
  107. CONVERGE FTTH – GPON Build-up in – QUEZON CITY (Bright Place Condominium) – September 12,2018
  108. CONVERGE FTTH – GPON Build-up in – MAKATI (Makati Cinema Square Tower) – September18, 2018
  109. CONVERGE FTTH – GPON Build-up in – PARANAQUE (Fountain Breeze Condominium Cluster1-16) – September 24,2018
  110. CONVERGE FTTH – GPON Build-up in – PARANAQUE (Solemare Parksuites Cluster 1-4) – September 21,2018
  111. CONVERGE FTTH – GPON Build-up in – MANILA (I TOWER) – October 09,2018
  112. CONVERGE FTTH – GPON Build-up in – MAKATI (One Pacific Place) – October04, 2018
  113. FTTH-SKYRISE – TAGUIG CITY (Arya Residences) Additional – October 15,2018
  114. FTTH PLDT E2E – MAKATI CITY (CENTURY DIAMOND TOWER) – February 10, 2020
  115. FTTE PLDT E2E – QUEZON CITY (DEPARTMENT OF INTERIOR ANDLOCAL GOVERNMENT) – February 17, 2020
  116. PLDT E2E-PASIG CITY(AGUSTIN 1 (FTTE)) -MARCH 5,2020
  117. FTTU – CONVERGE LIONS PARK RESIDENCES – OCT.08,2020
  118. FTTU – CONVERGE RADIANCE MANILA BAY – OCT. 08,2020
  119. FTTU PLDT-E2E-PASIG CITY- AMBERLAND PLAZA- DEC.09,2020
  120. FTTU PLDT-E2E-PASIG CITY -CITY & LAND MEGA PLAZA – DEC.09,2020
  121. FTTU SKY-IBS-GMM-TRIPH- OMM CITRA – DEC.09,2020
  122. FTTH-CONVERGE – MANILA (I TOWER) – January 04,2019
  123. FTTH PLDT E2E-BINONDO MANILA (PRINCE VIEW PARK SUITES) March 07,2019
  124. FTTH-CONVERGE – MAKATI (THE ORIENTAL PLACE) – February 02,2019
  125. FTTU PLDT E2E – BGC TAGUIG CITY (WORLD COMMERCE PLACE- TOWER 2) May 29,2019
  126. PLDT E2E – BGC TAGUIG CITY (CAPITAL HOUSE (FTTE) – May 21,2019

Achievement Note: Structured Cabling Project for Unilever.

Project Overview: Trigion is proud to announce the successful completion of a structured cabling project for Unilever, executed through TLIC. This project utilized advanced fiber-optic cable technology to enhance Unilever’s connectivity and operational efficiency.

Key Achievements:

  1. Project Completion:

    • Delivered the structured cabling installation on schedule, ensuring minimal disruption to Unilever’s daily operations.
  2. High-Speed Connectivity:

    • Implemented a robust fiber-optic cabling system that significantly increased data transmission speeds, supporting Unilever’s extensive communication needs.
  3. Scalability and Flexibility:

    • Designed the cabling infrastructure to be scalable, allowing for future expansions and upgrades as Unilever’s requirements evolve.
  4. Enhanced Reliability:

    • Achieved improved network reliability and reduced downtime, ensuring uninterrupted service for Unilever’s operations.
  5. Sustainability:

    • Utilized eco-friendly practices throughout the project, aligning with Unilever’s commitment to sustainability and reducing environmental impact.

Impact: The successful implementation of the structured cabling project has positioned Unilever to leverage enhanced connectivity, driving operational efficiency and supporting their innovative initiatives.

Acknowledgments: We extend our gratitude to the project team and partners for their dedication and expertise in bringing this project to fruition.

Next Steps: Trigion looks forward to continuing our partnership with Unilever, exploring further opportunities to enhance their technological infrastructure.

List of completed structured cabling projects.

  1. Sky Cable Optical Node segmentation Las Pinas, Paranaque, Taguig, Pateros, Pasig areas, October 2015
  2. VXI Coaxial Structured Cabling, Munoz, QC, Philippines, December 20, 2015
  3. Wi-Fi Network Installation in RCI Warehouses, Cabuyao, Laguna (phase 1, 7 warehouses), May 2016
  4. Wi-Fi Network Installation in RCI Warehouses, Cabuyao, Laguna (phase 2, 4 warehouses), July 2016
  5. Wi-Fi Network Installation in LG Warehouses, Legaspi, Pasig City, January 2017.
  6. PLDT E2E Fiber Link for Wi-Fi Solution in – GMM SOUTH (W Fifth – FTTB) – March 23, 2017.
  7. PLDT E2E Fiber Link for Wi-Fi Solution in – MANDALUYONG (Rizal Technology University)March 28, 2017.
  8. PLDT E2E Fiber Link for Wi-Fi Solution in – SOUTH (Shipco Transport Philippines) Inc. – March08, 2017.
  9. PLDT E2E Fiber Link for Wi-Fi Solution in – (Municipal of San Mateo) – March 31, 2017.
  10. PLDT E2E Fiber Link for Wi-Fi Solution in – ANGON RIZAL (Rizal Provincial Hospital Angono Annex) – April 18, 2017.
  11. PLDT E2E Fiber Link for Wi-Fi Solution in – MORONG RIZAL (Rizal Province Hospital) – April18, 2017.
  12. PLDT E2E Fiber Link for Wi-Fi Solution in – TAYTAY RIZAL (Taytay Emergency Hospital) – April18, 2017.
  13. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Cityhood Park) – May 11,2017
  14. Metro-wide CCTV Network, Brgy. San Roque Angono ( LGU Project) May, 2018
  15. Metro-wide CCTV Network, Brgy. San Pedro Angono ( LGU Project) May, 2018
  16. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Olandes Health Center) – June 21, 2017.
  17. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Barangka Health Center) – May 11, 2017.
  18. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Industrial Valley Complex Park) – June21, 2017.
  19. PLDT E2E Fiber Link for Wi-Fi Solution in – MANDALUYONG (Barangka Ilaya Health Center) – June 21, 2017.
  20. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (J. Dela Pena Health Center) – June 21,2017.
  21. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Balubad Health Center) – June 21, 2017.
  22. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Marikina Heights Health Center – July12, 2017
  23. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Sta. Elena Health Center) – August 24,2017
  24. PLDT E2E Fiber Link for Wi-Fi Solution in – PASIG (Dona Betang Health Center) – September 8,2017
  25. Metro-wide CCTV Network, Brgy. Mahabang Parang Angono ( LGU Project) December 2017

 

Transforming Visions into Reality: Our Turnkey Project Success

At Trigion, we pride ourselves on delivering exceptional turnkey projects that redefine efficiency and excellence. Our commitment to providing comprehensive solutions ensures that our clients can focus on their core business while we handle every aspect of project execution.

What is a Turnkey Project?

A turnkey project is a complete, ready-to-use solution where we manage the entire process from concept to completion. This means you receive a fully operational facility without the stress of coordinating multiple contractors or managing complex logistics.

Why Choose Trigion for Your Turnkey Projects?

  • Seamless Execution: Our expert team oversees every detail, ensuring that your project is delivered on time and within budget. We handle everything from design and construction to installation and commissioning.

  • Single Point of Contact: Enjoy the convenience of having one dedicated team managing your project. This simplifies communication and enhances accountability, allowing for quicker decision-making and problem resolution.

  • Quality Assurance: We adhere to the highest industry standards, ensuring that every aspect of your project meets our rigorous quality benchmarks. Our commitment to excellence guarantees a final product that exceeds your expectations.

  • Cost-Effective Solutions: By streamlining the project management process, we minimize overhead costs and pass those savings on to you. Our transparent pricing model ensures you know exactly what to expect.

  • Tailored to Your Needs: We understand that every client is unique. Our turnkey solutions are customized to fit your specific requirements, ensuring that your vision is brought to life exactly as you imagined.

Our Track Record of Success

With numerous successful turnkey projects across various industries, Trigion has established itself as a trusted partner for businesses looking to enhance their operations. Our portfolio showcases a diverse range of completed projects, each reflecting our dedication to quality and client satisfaction.

Let’s Build Your Future Together

Are you ready to take the next step in your project journey? Partner with Trigion for a hassle-free, efficient, and successful turnkey project experience. Contact us today to discuss how we can turn your vision into reality!

List of completed turn-key projects.

  1. Planet Cable FTTH Network (27 kms.-GPON Design and Build Project) Maia Alta Subd., Antipolo City, February 2019.
  2. Planet Cable FTTH Network (5 kms.-GPON Design and Build Project) Maia Vita Subd., Antipolo City, September 2019.
  3. Planet Cable FTTH Network (24 kms.-GPON Design and Build Project) La Hacienda Subd., Teresa, Rizal, April 2019.
  4. Planet Cable FTTH Network (12 kms.-GPON Design and Build Project) Empressa Subd., San Fernando, Pampanga, July 2019.
  5. Planet Cable FTTH Network (10 kms.-GPON Design and Build Project) Bria/ Camella Rizal, Binangonan, Rizal, June 2019.
  6. Planet Cable FTTH Network (7 kms.-GPON Design and Build Project) Camella Sierra Subd.,Angono Rizal, January 2020.
  7. Planet Cable -HFC Network Installations, Service/ Repairs and Maintenance, Antipolo and Cavite areas (manpower solution).
  8. Radius Telecom FTTH Network (GPON Design and Build Project) Cambridge Subd. Cainta Rizal, April 2021.
  9. Radius Telecom FTTH Network (GPON Design and Build Project) Excelsior Tower, Libis QC, June 2021.
  10. Radius Telecom FTTH Network (GPON Design and Build Project) Meria Residence, Pasig City, August 2021.
  11. Radius Telecom FTTH Network (GPON Design and Build Project) Lumiere Residence, Pasig City, January 2022.
  12. Radius Telecom -HFC Network Installations, Service/ Repairs and Maintenance, Antipolo and Cavite areas (manpower solution).

Asian Terminal Inc. (Manila and Batangas) ports.

Installations and configurations of vehicle-mounted terminals at ATI represent a significant step towards modernizing terminal operations. By leveraging technology, ATI aims to enhance efficiency, connectivity, and safety, ultimately leading to improved service delivery in the logistics sector.
COMPLETED GPON PROJECTS

Achievement Note: GPON End-to-End Solution for Envoy Hotel

Project Overview: We are proud to announce the successful implementation of a comprehensive GPON (Gigabit Passive Optical Network) end-to-end solution for the Envoy Hotel, executed through PT&T. This project was designed to enhance the hotel’s connectivity infrastructure, providing guests with high-speed internet access and supporting the hotel’s operational needs.

Key Achievements:

  1. Project Completion:

    • Successfully completed the GPON installation, including the deployment of OLT (Optical Line Terminal) equipment and ensuring minimal disruption to hotel operations.
  2. High-Speed Connectivity:

    • Delivered a robust network capable of supporting up to 10 Gbps of bandwidth, significantly improving guest internet experience and enabling seamless streaming, conferencing, and other online activities.
  3. Scalability:

    • Designed the GPON solution with scalability in mind, allowing for future upgrades and expansions to accommodate the hotel’s growing needs.
  4. Cost Efficiency:

    • Achieved a reduction in operational costs compared to previous network solutions, thanks to the efficiency of the GPON technology and the integration of OLT equipment.
  5. Enhanced Guest Experience:

    • Received positive feedback from guests regarding the improved internet speed and reliability, contributing to an increase in overall guest satisfaction ratings.
  6. Training and Support:

    • Provided comprehensive training for the hotel staff on managing and troubleshooting the new system, including the OLT equipment, ensuring they are equipped to handle any issues that may arise.
  7. Sustainability:

    • Implemented energy-efficient technologies within the GPON infrastructure, aligning with the hotel’s commitment to sustainability and reducing its carbon footprint.

Impact: The successful deployment of the GPON end-to-end solution, including OLT equipment, has positioned the Envoy Hotel as a leader in providing high-quality connectivity services in the hospitality sector. This project not only enhances the guest experience but also supports the hotel’s operational efficiency and future growth.

Acknowledgments: We would like to extend our gratitude to the project team, partners, and stakeholders who contributed to the successful execution of this project. Your dedication and expertise were instrumental in achieving this milestone.

Next Steps: We look forward to monitoring the performance of the GPON solution and exploring further enhancements to ensure the Envoy Hotel continues to provide exceptional service to its guests.

List of completed GPON projects.

  1. CONVERGE FTTH – GPON Build-up in –MUNTINLUPA (Parkhomes Tunasan) January 27, 2017.
  2. CONVERGE FTTH – GPON Build-up in – St. Francis Condominium (with Slab Scanning )February 15, 2017.
  3. CONVERGE FTTH – GPON Build-up in One Jeroma Place ( Congressional Ave. Ext. Quezon City – February 23,2017.
  4. PLDT FTTE – GPON Build-up in Figaro Solutions Inc, February 24, 2017.
  5. Smart FBTS Link in -Makati, Dian Cell Site- Palanan Cell Site, March 15, 2017.
  6. CONVERGE FTTH – GPON Build-up in – THREE JEROMA PLACE (Congressional Ave, Ext.Quezon City – February 23,2017.
  7. CONVERGE FTTH – GPON Build-up in – ISLAND PALM TOWER CONDOMINIUM (34 N.Domingo Ave. New Manila, Quezon, City) – March 20, 2017.
  8. PLDT E2E FTTE Link in – QUEZON CITY (Greenpeace Sea Environmental Trust Inc.) – April 18,2017.
  9. PLDT E2E FTTE Link in – QUEZON CITY (Continental Court Bldg. (Dr. Ventura) – April 18, 2017
  10. PLDT E2E FTTE Link in – MANILA (UP Manila-National Institute of Health) – April 18, 2017
  11. CONVERGE FTTH – GPON Build-up in – CRISANTA TOWER (325 Captain Javier St. Brgy.Oranbo, Pasig City) – April 19, 2017.
  12. CONVERGE FTTH – GPON Build-up in – GOTACO BLDG 1&2 (74 Valencia St. Quezon City) – April 19, 2017.
  13. PLDT E2E FTTE Link in – RIZAL (Municipality of Angono) – April 25, 2017.
  14. PLDT E2E FTTE Link in – MANILA (UP Manila – National Institute of Health) – May 16, 2017.
  15. PLDT E2E FTTE Link in – QUEZON CITY (D&L Industries) – May 15, 2017.
  16. PLDT E2E FTTE Link in – MANILA (Espana Grand Residences Tower 2) – May 15, 2017.
  17. PLDT E2E FTTE Link in – VALENZUELA (Bestank Manufacturing Corp) – May 15, 2017.
  18. PLDT E2E FTTE Link in – ANTIPOLO (Tanay Rural Bank Inc.) – May 15, 2017.
  19. PLDT E2E FTTE Link in – PASIG (ComClark Network and Technology Corp) – May 15, 2017.
  20. PLDT E2E FTTE Link in – QUEZON CITY (Bureau of Fisheries and Aquatic Resources) – May 15,2017.
  21. PLDT E2E FTTE Link in – QUEZON CITY (Department of Interior and Local Government) – May20,2017.
  22. PLDT E2E FTTE Link in – CAINTA (Tanay Rural Bank Inc.) – May 15, 2017.
  23. PLDT E2E FTTE Link in – ANTIPOLO RIZAL (Cherry Foodarama) – May 20, 2017.
  24. PLDT E2E FTTE Link in – PASIG (HTech Corporation (Rosario)) – May 23, 2017.
  25. PLDT E2E FTTE Link in – PASIG (HTech Corporation (Mercedes)) – May 23,2017.
  26. PLDT E2E FTTE Link in – MANILA (Maxicare) – May 25, 2017.
  27. PLDT E2E FTTE Link in – QUEZON CITY (Motor and Carriage Inc.) – May 25, 2017.
  28. PLDT E2E – FTTE Link in – PASIG (Bramante Commercial Center) – May 26, 2017.
  29. PLDT E2E FTTE Link in – PASIG (45 San Miguel) – May 26, 2017.
  30. PLDT E2E FTTE Link in – PASIG (Greenhills Christian Fellowship) – May 26, 2017.
  31. CONVERGE FTTH – GPON Build-up in – ALPHA GRAND VIEW CONDOMINIUM (
    1716 MHDel Pilar St. Malate, Manila) – June 02, 2017.
  32. SKYRISE FTTH GPON Build-up in – MAPRE INSULAR CORPORATE CENTER (MBP,Alabang, Muntinlupa) – June 13, 2017.
  33. CONVERGE FTTH – GPON Build-up in – INSULAR HEALTH CARE BUILDING (167 LegaspiSt. Cor. Dela Rosa St. Legaspi Village, Makati City) – July 03, 2017.
  34. CONVERGE FTTH – GPON Build-up in – INSULAR LIFE BUILDING (Paseo de Roxas cor.Ayala Ave. Makati, City) – July 03, 2017.
  35. PLDT E2E FTTU – GPON Build-up in PASIG (Taipan Place). July 03, 2017.
  36. PLDT E2E FITL Link – GMM (Antipolo City Valley View Drive 2) – July 14, 2017.
  37. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Marikina City Health Center)– July22,2017
  38. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Olandes Health Center) Additional – July22, 2017.
  39. PLDT E2E FTTE Link in – MAKATI (Raffles Makati) – July 25, 2017.
  40. PLDT E2E FTTE Link in – MAKATI (DBP Building) – July 25, 2017.
  41. PLDT E2E FTTE Link in – QUEZON CITY (Studio A) – July 25, 2017.
  42. CONVERGE FTTH – GPON Build-up in – ASPEN TOWER (Muntinlupa) – August 23, 2017
  43. PLDT E2E FTTE Link in – QUEZON CITY (Gateway Tower/Cybergate Tower 1) – September 05,2017
  44. CONVERGE FTTH – GPON Build-up in – VALENCIA HILLS CONDOMINIUM (San Juan City) –
  45. CONVERGE FTTH – GPON Build-up in – STUDIO CITY TOWER 1 (West Park Drive FilinvestCorporate City Alabang Muntinlupa) – September 15, 2017
  46. PLDT E2E FITL Link – GMM (Cubao-Garment FITL 2) – September 14, 2017
  47. PLDT E2E FITL Link – GMM (Shaw Tower Ortigas) – September 19,2017
  48. PLDT E2E FTTE Link in – MANILA (Philippine Normal University) – September 18, 2017
  49. PLDT E2E FTTU – GPON Build-up – MAKATI (Paseo De Roces Tower 1) – October 02, 2017
  50. CONVERGE FTTH – GPON Build-up in – STUDIO CITY TOWER 2 (Muntinlupa City) –
    October5, 2017
  51. CONVERGE FTTH – GPON Build-up in – INSULAR HEALTH CARE BUILDING (167 LegaspiSt. Cor. Dela Rosa St. Legaspi Village, Makati City) Additional – October 9, 2017
  52. PLDT E2E FTTE Link in – MARIKINA (FDC-Interim for Topbest Pest Inc.) – October 16, 2017
  53. PLDT E2E FTTE Link in – RIZAL (APT Entertainment Building, Cainta) – October 19, 2017
  54. PLDT E2E FITL Link – GMM (South Marikina FITL 4) – October 24,20CONVERGE FTTH – GPON Build-up in – VALENCIA HILLS CONDOMINIUM (SanJuan City) Additional – October 18, 2017
  55. PLDT E2E FTTU – GPON Build-up – PARANAQUE (Monarch Parksuites Cluster 1-4) – November2, 2017
  56. PLDT E2E FTTU – GPON Build-up – QUEZON CITY (The Sky Suites Tower (GA Sky Suites)) – November 6,2017
  57. PLDT E2E FTTU – GPON Build-up – MANDALUYONG (California Garden Square Cluster A-F) – November 6, 2017
  58. PLDT E2E – PASIG (FDC – Interim for Goldilocks Bakeshop, Inc.) – November 8, 2017
  59. PLDT E2E – QUEZON CITY (Ortigas and Company Limited Partnership) – November 9, 2017
  60. CONVERGE FTTH – GPON Build-up in – SOLER TOWER (1336 Soler St. Sta. Cruz, Manila) – November 2, 2017
  61. PLDT E2E FTTE Link in – GMM (Sogo Hotel) – November 11,2017
  62. PLDT E2E FBTS Link in – GMM (Binangonan 2) November 17,2017
  63. PLDT E2E FTTE Link in – QUEZON CITY (XTRIX Computer Corporation) – November 21, 2017
  64. CONVERGE FTTH – GPON Build-up in – ARISTA RESIDENCES (Parañaque City) – October20,2017
  65. CONVERGE FTTH – GPON Build-up in – THE CAMBRIDGE VILLAGE FORDHAM – CLUSTER 11 & 15 (Block Kabisig, Floodway, Cambridge St. Cainta, 1990 Rizal) – December 12,  2017
  66. CONVERGE FTTH – GPON Build-up in – THE IGNACIA PLACE (62 Sgt. Esguerra St. Cor.Mother Ignacia Avenue – December 6,2017
  67. CONVERGE FTTH – GPON Build-up in – DOVER HILL (San Juan City) – December 21,2017
  68. CONVERGE FTTH – GPON Build-up in – THE CAMBRIDGE VILLAGE – (CLUSTER 1- 34)Block Kabisig, Floodway, Cambridge St. Cainta, 1990 Rizal) – December 14, 2017
  69. CONVERGE FTTH – GPON Build-up in – TAGUIG CITY (The Trion Towers) – January 25, 2018
  70. PLDT E2E FTTE Link in – GMM (XITRIX Computer Corporation) Additional – January 31, 2018
  71. CONVERGE FTTH – GPON Build-up in –SAN JUAN CITY (Dover Hill) – February 5,2018
  72. CONVERGE FTTH – GPON Build-up in –WILCON IT HUB (Don Chino Roces Ave, Magallanes,Makati City) – February 28, 2018
  73. PLDT E2E FTTE Link in – GMM (Google) – March 02,2018
  74. PLDT E2E – GMM (Pasay FITL (Financial Complex Loop) – March 13,2018
  75. PLDT E2E FTTE Link in – GMM (RCBC PLAZA TOWER 2) – March 19, 2018
  76. PLDT E2E FTTE Link in – GMM (LG Electronics Philippines, Inc. (Pasig)) – March 19,2018
  77. PLDT E2E FTTE Link in – GMM –(GREPALIFE BUILDING) – March 21, 2018
  78. PLDT E2E FTTE Link in – GMM (Global Rescue Pacific LLC Philippines) – March 25, 2018
  79. CONVERGE FTTH – GPON Build-up in –LPL Center (LP Leviste Street Makati City) – March26,2018 April 11,2018
  80. CONVERGE FTTH – GPON Build-up in – The Avenue Residences (55S Tandang Sora Ave.,Novaliches, Quezon City, 1116, Metro Manila – March 26, 2018
  81. CONVERGE FTTH – GPON Build-up in – ROBINSONS PLACE RESIDENCES (Tower 1&2) –
  82. CONVERGE FTTH – GPON Build-up in -CAPRI CONDOMINIUM (W Service Road,, Ayala Alabang) – April 11,2018
  83. CONVERGE FTTH – GPON Build-up in – INSULAR HEALTH CARE BUILDING )167 Legaspi St. Cor. Dela Rosa St. Legaspi Village , Makati City) Additional – April 16, 2018
  84. CONVERGE FTTH – GPON Build-up in – GRAND CENTURY MANSION (841 Zacateros, Sta.Cruz Manila) – April 16,2018
  85. PLDT E2E FTTU – GPON Build-up – GMM (JMT Corporate Condominium) – April 19, 2018
  86. FTTH-SKYRISE – TAGUIG CITY (Arya Residences) – February 05, 2018
  87. CONVERGE FTTH – GPON Build-up in – BSA TWIN TOWER (Mandaluyong) – May 11, 2018
  88. PLDT E2E – GMM (Cubao-Garment FITL 2) – May 30,2018
  89. PLDT E2E – XAVIERVILLE SQUARE CONDOMINIUM (Quezon City) – June 27,2018
  90. CONVERGE FTTH – GPON Build-up in – LEE TOWER (Manila) – July 09,2018
  91. PLDT E2E – MAKATI CITY (Grepalife Building) – July 11, 2018
  92. FTTH-SKYRISE – QUEZON CITY (Viera Residences) – July 17,2018
  93. CONVERGE FTTH – GPON Build-up in – KNIGHT BRIDGE RESIDENCES (Makati City) – August 07,2018
  94. CONVERGE FTTH – GPON Build-up in – GRAND CENTURY MANSION (841 ZACATEROS,STA. CRUZ MANILA ) August 08,2018
  95. CONVERGE FTTH – GPON Build-up in – THE AVENUE RESIDENCES (555 Tandang Sora Ave.Novaliches, Quezon City, 1116 Metro Manila) – August 08, 2018
  96. PLDT E2E – FILINVEST 3 (Alabang) – August 10,2018
  97. PLDT E2E – ADMIRALTY BUILDING (Alabang) – August 10 ,2018
  98. CONVERGE FTTH – GPON Build-up in – BINONDO TERRACE 2 (Manila) – August 13,2018
  99. PLDT E2E – BRIGHT PLACE CONDOMINIUM (Quezon City) – August 14, 2018
  100. FTTH-SKYRISE – ALABANG (Citibank Frabelle – August 15,2018
  101. FTTH-SKYRISE – ALABANG (NOL Bldg.) – August 15,2018
  102. PLDT E2E – MAKATI CITY (Makati Executive Center) – August 22,2018
  103. CONVERGE FTTH – GPON Build-up in – STANFORD CONDOMINIUM (Manila) – August28,2018
  104. CONVERGE FTTH – GPON Build-up in – ALABANG (Studio City Tower 3) – September 03,2018
  105. FTTH – SKYRISE – MUNTINLUPA (Common Goal Tower) – September 12,2018
  106. CONVERGE FTTH – GPON Build-up in – MANILA (I TOWER) – September 17,2018
  107. CONVERGE FTTH – GPON Build-up in – QUEZON CITY (Bright Place Condominium) – September 12,2018
  108. CONVERGE FTTH – GPON Build-up in – MAKATI (Makati Cinema Square Tower) – September18, 2018
  109. CONVERGE FTTH – GPON Build-up in – PARANAQUE (Fountain Breeze Condominium Cluster1-16) – September 24,2018
  110. CONVERGE FTTH – GPON Build-up in – PARANAQUE (Solemare Parksuites Cluster 1-4) – September 21,2018
  111. CONVERGE FTTH – GPON Build-up in – MANILA (I TOWER) – October 09,2018
  112. CONVERGE FTTH – GPON Build-up in – MAKATI (One Pacific Place) – October04, 2018
  113. FTTH-SKYRISE – TAGUIG CITY (Arya Residences) Additional – October 15,2018
  114. FTTH PLDT E2E – MAKATI CITY (CENTURY DIAMOND TOWER) – February 10, 2020
  115. FTTE PLDT E2E – QUEZON CITY (DEPARTMENT OF INTERIOR ANDLOCAL GOVERNMENT) – February 17, 2020
  116. PLDT E2E-PASIG CITY(AGUSTIN 1 (FTTE)) -MARCH 5,2020
  117. FTTU – CONVERGE LIONS PARK RESIDENCES – OCT.08,2020
  118. FTTU – CONVERGE RADIANCE MANILA BAY – OCT. 08,2020
  119. FTTU PLDT-E2E-PASIG CITY- AMBERLAND PLAZA- DEC.09,2020
  120. FTTU PLDT-E2E-PASIG CITY -CITY & LAND MEGA PLAZA – DEC.09,2020
  121. FTTU SKY-IBS-GMM-TRIPH- OMM CITRA – DEC.09,2020
  122. FTTH-CONVERGE – MANILA (I TOWER) – January 04,2019
  123. FTTH PLDT E2E-BINONDO MANILA (PRINCE VIEW PARK SUITES) March 07,2019
  124. FTTH-CONVERGE – MAKATI (THE ORIENTAL PLACE) – February 02,2019
  125. FTTU PLDT E2E – BGC TAGUIG CITY (WORLD COMMERCE PLACE- TOWER 2) May 29,2019
  126. PLDT E2E – BGC TAGUIG CITY (CAPITAL HOUSE (FTTE) – May 21,2019
COMPLETED STRUCTURED CABLING PROJECTS

Achievement Note: Structured Cabling Project for Unilever.

Project Overview: Trigion is proud to announce the successful completion of a structured cabling project for Unilever, executed through TLIC. This project utilized advanced fiber-optic cable technology to enhance Unilever’s connectivity and operational efficiency.

Key Achievements:

  1. Project Completion:

    • Delivered the structured cabling installation on schedule, ensuring minimal disruption to Unilever’s daily operations.
  2. High-Speed Connectivity:

    • Implemented a robust fiber-optic cabling system that significantly increased data transmission speeds, supporting Unilever’s extensive communication needs.
  3. Scalability and Flexibility:

    • Designed the cabling infrastructure to be scalable, allowing for future expansions and upgrades as Unilever’s requirements evolve.
  4. Enhanced Reliability:

    • Achieved improved network reliability and reduced downtime, ensuring uninterrupted service for Unilever’s operations.
  5. Sustainability:

    • Utilized eco-friendly practices throughout the project, aligning with Unilever’s commitment to sustainability and reducing environmental impact.

Impact: The successful implementation of the structured cabling project has positioned Unilever to leverage enhanced connectivity, driving operational efficiency and supporting their innovative initiatives.

Acknowledgments: We extend our gratitude to the project team and partners for their dedication and expertise in bringing this project to fruition.

Next Steps: Trigion looks forward to continuing our partnership with Unilever, exploring further opportunities to enhance their technological infrastructure.

List of completed structured cabling projects.

  1. Sky Cable Optical Node segmentation Las Pinas, Paranaque, Taguig, Pateros, Pasig areas, October 2015
  2. VXI Coaxial Structured Cabling, Munoz, QC, Philippines, December 20, 2015
  3. Wi-Fi Network Installation in RCI Warehouses, Cabuyao, Laguna (phase 1, 7 warehouses), May 2016
  4. Wi-Fi Network Installation in RCI Warehouses, Cabuyao, Laguna (phase 2, 4 warehouses), July 2016
  5. Wi-Fi Network Installation in LG Warehouses, Legaspi, Pasig City, January 2017.
  6. PLDT E2E Fiber Link for Wi-Fi Solution in – GMM SOUTH (W Fifth – FTTB) – March 23, 2017.
  7. PLDT E2E Fiber Link for Wi-Fi Solution in – MANDALUYONG (Rizal Technology University)March 28, 2017.
  8. PLDT E2E Fiber Link for Wi-Fi Solution in – SOUTH (Shipco Transport Philippines) Inc. – March08, 2017.
  9. PLDT E2E Fiber Link for Wi-Fi Solution in – (Municipal of San Mateo) – March 31, 2017.
  10. PLDT E2E Fiber Link for Wi-Fi Solution in – ANGON RIZAL (Rizal Provincial Hospital Angono Annex) – April 18, 2017.
  11. PLDT E2E Fiber Link for Wi-Fi Solution in – MORONG RIZAL (Rizal Province Hospital) – April18, 2017.
  12. PLDT E2E Fiber Link for Wi-Fi Solution in – TAYTAY RIZAL (Taytay Emergency Hospital) – April18, 2017.
  13. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Cityhood Park) – May 11,2017
  14. Metro-wide CCTV Network, Brgy. San Roque Angono ( LGU Project) May, 2018
  15. Metro-wide CCTV Network, Brgy. San Pedro Angono ( LGU Project) May, 2018
  16. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Olandes Health Center) – June 21, 2017.
  17. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Barangka Health Center) – May 11, 2017.
  18. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Industrial Valley Complex Park) – June21, 2017.
  19. PLDT E2E Fiber Link for Wi-Fi Solution in – MANDALUYONG (Barangka Ilaya Health Center) – June 21, 2017.
  20. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (J. Dela Pena Health Center) – June 21,2017.
  21. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Balubad Health Center) – June 21, 2017.
  22. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Marikina Heights Health Center – July12, 2017
  23. PLDT E2E Fiber Link for Wi-Fi Solution in – MARIKINA (Sta. Elena Health Center) – August 24,2017
  24. PLDT E2E Fiber Link for Wi-Fi Solution in – PASIG (Dona Betang Health Center) – September 8,2017
  25. Metro-wide CCTV Network, Brgy. Mahabang Parang Angono ( LGU Project) December 2017

 

COMPLETED TURN-KEY PROJECTS

Transforming Visions into Reality: Our Turnkey Project Success

At Trigion, we pride ourselves on delivering exceptional turnkey projects that redefine efficiency and excellence. Our commitment to providing comprehensive solutions ensures that our clients can focus on their core business while we handle every aspect of project execution.

What is a Turnkey Project?

A turnkey project is a complete, ready-to-use solution where we manage the entire process from concept to completion. This means you receive a fully operational facility without the stress of coordinating multiple contractors or managing complex logistics.

Why Choose Trigion for Your Turnkey Projects?

  • Seamless Execution: Our expert team oversees every detail, ensuring that your project is delivered on time and within budget. We handle everything from design and construction to installation and commissioning.

  • Single Point of Contact: Enjoy the convenience of having one dedicated team managing your project. This simplifies communication and enhances accountability, allowing for quicker decision-making and problem resolution.

  • Quality Assurance: We adhere to the highest industry standards, ensuring that every aspect of your project meets our rigorous quality benchmarks. Our commitment to excellence guarantees a final product that exceeds your expectations.

  • Cost-Effective Solutions: By streamlining the project management process, we minimize overhead costs and pass those savings on to you. Our transparent pricing model ensures you know exactly what to expect.

  • Tailored to Your Needs: We understand that every client is unique. Our turnkey solutions are customized to fit your specific requirements, ensuring that your vision is brought to life exactly as you imagined.

Our Track Record of Success

With numerous successful turnkey projects across various industries, Trigion has established itself as a trusted partner for businesses looking to enhance their operations. Our portfolio showcases a diverse range of completed projects, each reflecting our dedication to quality and client satisfaction.

Let’s Build Your Future Together

Are you ready to take the next step in your project journey? Partner with Trigion for a hassle-free, efficient, and successful turnkey project experience. Contact us today to discuss how we can turn your vision into reality!

List of completed turn-key projects.

  1. Planet Cable FTTH Network (27 kms.-GPON Design and Build Project) Maia Alta Subd., Antipolo City, February 2019.
  2. Planet Cable FTTH Network (5 kms.-GPON Design and Build Project) Maia Vita Subd., Antipolo City, September 2019.
  3. Planet Cable FTTH Network (24 kms.-GPON Design and Build Project) La Hacienda Subd., Teresa, Rizal, April 2019.
  4. Planet Cable FTTH Network (12 kms.-GPON Design and Build Project) Empressa Subd., San Fernando, Pampanga, July 2019.
  5. Planet Cable FTTH Network (10 kms.-GPON Design and Build Project) Bria/ Camella Rizal, Binangonan, Rizal, June 2019.
  6. Planet Cable FTTH Network (7 kms.-GPON Design and Build Project) Camella Sierra Subd.,Angono Rizal, January 2020.
  7. Planet Cable -HFC Network Installations, Service/ Repairs and Maintenance, Antipolo and Cavite areas (manpower solution).
  8. Radius Telecom FTTH Network (GPON Design and Build Project) Cambridge Subd. Cainta Rizal, April 2021.
  9. Radius Telecom FTTH Network (GPON Design and Build Project) Excelsior Tower, Libis QC, June 2021.
  10. Radius Telecom FTTH Network (GPON Design and Build Project) Meria Residence, Pasig City, August 2021.
  11. Radius Telecom FTTH Network (GPON Design and Build Project) Lumiere Residence, Pasig City, January 2022.
  12. Radius Telecom -HFC Network Installations, Service/ Repairs and Maintenance, Antipolo and Cavite areas (manpower solution).
Other Completed Project

Asian Terminal Inc. (Manila and Batangas) ports.

Installations and configurations of vehicle-mounted terminals at ATI represent a significant step towards modernizing terminal operations. By leveraging technology, ATI aims to enhance efficiency, connectivity, and safety, ultimately leading to improved service delivery in the logistics sector.